Skip to main content
CallStart your build
Back to our work

New Builds

A new home in Geraldine

New home near completion in Geraldine, boasting new recycled-look bricks mixed with James Hardie Stria cladding. Inbuilt log fire surrounded by brick complements the polished concrete floor.

Where
Geraldine
Build
New build
  • Site works, with the section stripped and the building platform set out
    Site works, with the section stripped and the building platform set out
  • The wall frames standing on the slab
    The wall frames standing on the slab
  • The trusses on, seen from above
    The trusses on, seen from above
  • The entry, with the garage alongside
    The entry, with the garage alongside
  • The living room, opening to the north
    The living room, opening to the north
  • The main bathroom, with its bath under the high window
    The main bathroom, with its bath under the high window
  • The double garage
    The double garage

Get in touch.

Tell us what you’re planning.

  • A transportable home
  • A new build
  • A custom home
  • A renovation or extension
  • A house & land package
  • Yes
  • No
  • Not yet
  • Yes
  • No
  • Not yet
  • As soon as possible
  • In the next 6 months
  • 6 to 12 months
  • Just planning

Upload plans or photos